| S.No. | Title | Path | |
| 1 | Notice dated 21/09/26 for - 2421 of 2026 - UP Sugar Mills Co-Gen Association - Seeking appropriate directions for implementation of a regulatory compliant billing methodology for accounting of transmission line losses under the scheduled energy regime and for consequential reliefs. | NoticePt-no-2421of2026UPSugarMills-03-11-2026-PDF921202652726PM.pdf | Notice dated 21/09/26 for - 2421 of 2026 - UP Sugar Mills Co-Gen Association - Seeking appropriate directions for implementation of a regulatory compliant billing methodology for accounting of transmission line losses under the scheduled energy regime and for consequential reliefs. |
| 2 | Notice dated 21/09/26 for - 2423 of 2026 - UPRVUNL - Seeking approval of deviations from the standard bidding guidelines in the draft Request for Selection for setting up a minimum 640 MW Pumped Hydro Storage Plant using the Upper Reservoir at Rihand Dam and the Lower Reservoir at Obra Dam in the district of Sonebhadra, Uttar Pradesh, on a Tariff-Based Competitive Bidding basis. | NoticePt-no-2423of2026UPRVUNL-15-10-2026-PDF921202652928PM.pdf | Notice dated 21/09/26 for - 2423 of 2026 - UPRVUNL - Seeking approval of deviations from the standard bidding guidelines in the draft Request for Selection for setting up a minimum 640 MW Pumped Hydro Storage Plant using the Upper Reservoir at Rihand Dam and the Lower Reservoir at Obra Dam in the district of Sonebhadra, Uttar Pradesh, on a Tariff-Based Competitive Bidding basis. |
| 3 | Notice dated 21/09/26 for 2416 of 2026 - Adoption of the Tariff based on the tariff determined under Short Term Competitive Bidding Guidelines issued by MoP as per Sec. 63 of the Electricity Act, 2003 for the procurement of 5.00 MW Round the Clock (RTC) Renewable Energy for a period of 5 months i.e. from 1 November, 2026 to 31 March, 2027 and 3.00 MW Round the Clock (RTC) Renewable Energy for a period of 3 months i.e. from 1 January, 2027 to 31 March, 2027 for meeting Renewable Purchase Obligation for FY 2026-27 and in principle approval of purchase of deficit power from Power Exchanges for its Load Management. | RescheduledNoticePt-no-2416of2026NIDP-06-10-2026-PDF921202653146PM.pdf | Notice dated 21/09/26 for 2416 of 2026 - Adoption of the Tariff based on the tariff determined under Short Term Competitive Bidding Guidelines issued by MoP as per Sec. 63 of the Electricity Act, 2003 for the procurement of 5.00 MW Round the Clock (RTC) Renewable Energy for a period of 5 months i.e. from 1 November, 2026 to 31 March, 2027 and 3.00 MW Round the Clock (RTC) Renewable Energy for a period of 3 months i.e. from 1 January, 2027 to 31 March, 2027 for meeting Renewable Purchase Obligation for FY 2026-27 and in principle approval of purchase of deficit power from Power Exchanges for its Load Management. |
| 4 | Notice dated 10/09/26 for 2269 of 2025- Bundelkhand Saur Urja Limited - Seeking declaration of change in law event due to change in rate of GST on the EPC contract Vide Ministry of Finances Notification No. 08/2021 Central Tax dated 30.09.2021 and approval of additional cost/compensation incurred due to said change in the rate of GST on the Project and additional Cost towards the capital expenditure on account of extension of SCOD due to COVID-19. | NoticePt-no-2269of2025BSUL-03-11-2026-PDF910202610841PM.pdf | Notice dated 10/09/26 for 2269 of 2025- Bundelkhand Saur Urja Limited - Seeking declaration of change in law event due to change in rate of GST on the EPC contract Vide Ministry of Finances Notification No. 08/2021 Central Tax dated 30.09.2021 and approval of additional cost/compensation incurred due to said change in the rate of GST on the Project and additional Cost towards the capital expenditure on account of extension of SCOD due to COVID-19. |
| 5 | Notice dated 03/09/26 Shri Chakresh Jain, N-60, Greater Kailash-1, New Delhi-110048 Vs Prateek Realtors India Pvt. Ltd., Pro. Shri Meenaz, A-42, Sector 67, Noida UP. / M/s Prateek Infratech India Pvt. Ltd., Pro. Shri Meenaz, A-42, Sector 67, Noida UP. / Executive Engineer, Electricity Urban Distribution Division-I, PVVNL Sector 25, Noida. | ChakreshJain(Liston09-09-2026)-PDF93202653835PM.pdf | Notice dated 03/09/26 Shri Chakresh Jain, N-60, Greater Kailash-1, New Delhi-110048 Vs Prateek Realtors India Pvt. Ltd., Pro. Shri Meenaz, A-42, Sector 67, Noida UP. / M/s Prateek Infratech India Pvt. Ltd., Pro. Shri Meenaz, A-42, Sector 67, Noida UP. / Executive Engineer, Electricity Urban Distribution Division-I, PVVNL Sector 25, Noida. |
| 6 | Notice dated 03/09/26 Smt. Deepa Gaur W/o Shri Apurv Gaur & 18 other, Flat No. 1104, Block B-4, MI Rustle Court, Baghamau Road, Amar Shahid Path Sector-6, Gomti Nagar Vistar, Lucknow and Others Vs Executive Engineer, Electricity Urban Distribution Division-Chinhat, 33/11 KV Electricity Sub-Station, Sector-04, Gomti Nagar Extension, Lucknow/M/s M.I. Builders Pvt. Ltd., 6th Flor, New Janpath, 9-A Ashok Marg, Hazratganj, Lucknow. | DeepaGaur(Liston09-09-2026)-PDF93202653709PM.pdf | Notice dated 03/09/26 Smt. Deepa Gaur W/o Shri Apurv Gaur & 18 other, Flat No. 1104, Block B-4, MI Rustle Court, Baghamau Road, Amar Shahid Path Sector-6, Gomti Nagar Vistar, Lucknow and Others Vs Executive Engineer, Electricity Urban Distribution Division-Chinhat, 33/11 KV Electricity Sub-Station, Sector-04, Gomti Nagar Extension, Lucknow/M/s M.I. Builders Pvt. Ltd., 6th Flor, New Janpath, 9-A Ashok Marg, Hazratganj, Lucknow. |
| 7 | Notice dated 03/09/26 Shri Krishna Mohan Agarwal C-232, Pocket GC 4 (4th Avenue), Gaur City, Plot No. GH -01, Sector-4, Greater Noida West, Gautam Budh Nagar | KrishnaMohanAgarwal-PDF93202654725PM.pdf | Notice dated 03/09/26 Shri Krishna Mohan Agarwal C-232, Pocket GC 4 (4th Avenue), Gaur City, Plot No. GH -01, Sector-4, Greater Noida West, Gautam Budh Nagar |
| 8 | Notice dated 03/09/26 Shri Sachin Malik, Chairman and 3 Others, Windsar Court Welfare Association, Flat No.- G.A.-202, Sector-78, Noida. vs M/s Assotech Ltd., H-127, Sector-63, Noida. and Executive Engineer, Electricity Urban Distribution Division-I, Sector-25, Noida. | SachinMalik(Liston09-09-2026)-PDF93202653931PM.pdf | Notice dated 03/09/26 Shri Sachin Malik, Chairman and 3 Others, Windsar Court Welfare Association, Flat No.- G.A.-202, Sector-78, Noida. vs M/s Assotech Ltd., H-127, Sector-63, Noida. and Executive Engineer, Electricity Urban Distribution Division-I, Sector-25, Noida. |
| 9 | Notice dated 02/09/26 for 2332 of 2025 - Petition under section 86(1)(f) read with Section 158 and Section 94(2) along with other relevant provisions of the Electricity Act, 2003 read with terms of the Power Purchase Agreements, seeking referral of certain non-tariff issues for arbitration in terms of Clause 17.3.2 of the Power Purchase Agreements. | Notice2332-PDF92202661808PM.pdf | Notice dated 02/09/26 for 2332 of 2025 - Petition under section 86(1)(f) read with Section 158 and Section 94(2) along with other relevant provisions of the Electricity Act, 2003 read with terms of the Power Purchase Agreements, seeking referral of certain non-tariff issues for arbitration in terms of Clause 17.3.2 of the Power Purchase Agreements. |
| 10 | Notice dated 02/09/26 for 2416 of 2026 - Adoption of the Tariff based on the tariff determined under Short Term Competitive Bidding Guidelines issued by MoP as per Sec. 63 of the Electricity Act, 2003 for the procurement of 5.00 MW Round the Clock (RTC) Renewable Energy for a period of 5 months i.e. from 1 November, 2026 to 31 March, 2027 and 3.00 MW Round the Clock (RTC) Renewable Energy for a period of 3 months i.e. from 1 January, 2027 to 31 March, 2027 for meeting Renewable Purchase Obligation for FY 2026-27 and in principle approval of purchase of deficit power from Power Exchanges for its Load Management. | Notice2416-PDF92202661444PM.pdf | Notice dated 02/09/26 for 2416 of 2026 - Adoption of the Tariff based on the tariff determined under Short Term Competitive Bidding Guidelines issued by MoP as per Sec. 63 of the Electricity Act, 2003 for the procurement of 5.00 MW Round the Clock (RTC) Renewable Energy for a period of 5 months i.e. from 1 November, 2026 to 31 March, 2027 and 3.00 MW Round the Clock (RTC) Renewable Energy for a period of 3 months i.e. from 1 January, 2027 to 31 March, 2027 for meeting Renewable Purchase Obligation for FY 2026-27 and in principle approval of purchase of deficit power from Power Exchanges for its Load Management. |
| 11 | Notice dated 02/09/26 for 2417 of 2026 - Petition under Regulation 14,15 and 59 of UPERC CBR 2019, Read with Section 86(`1)(B) of EA 2003 Read with PPA Dated 29.08.2002. | Notice2417-PDF92202661706PM.pdf | Notice dated 02/09/26 for 2417 of 2026 - Petition under Regulation 14,15 and 59 of UPERC CBR 2019, Read with Section 86(`1)(B) of EA 2003 Read with PPA Dated 29.08.2002. |
| 12 | Notice dated 02/09/26 for 2418 of 2026 - Seeking approval of this Hon’ble Commission for long-term procurement of power from 300 MW Renewable Energy (RE) Round the Clock (RTC) Power Project through Tariff-Based Competitive Bidding process and seeking approval of the proposed deviation from the aforesaid Guidelines. | Notice2418-PDF92202661349PM.pdf | Notice dated 02/09/26 for 2418 of 2026 - Seeking approval of this Hon’ble Commission for long-term procurement of power from 300 MW Renewable Energy (RE) Round the Clock (RTC) Power Project through Tariff-Based Competitive Bidding process and seeking approval of the proposed deviation from the aforesaid Guidelines. |
| 13 | Notice dated 02/09/26 for 2419 of 2026 - Petition under Section 63 read with Section 86(1)(b) of the Electricity Act, 2003 read with Regulation 4 of the UPERC (Modalities of Tariff Determination) Regulations, 2023 and Clause 4 of the Guidelines for long term Procurement of Electricity from Thermal Power Stations set up on Design, Build, Finance, Own and Operate (DBFOO) basis and sourcing fuel as provided under the Model Bidding Documents including allocation of coal under B(I), B(III) and B(IV) of the SHAKTI (Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India) Policy dated 06.03.2019, seeking prior approval of this Hon’ble Commission for procurement of 100 MW thermal power on a long-term basis through Tariff-Based Competitive Bidding process, and seeking approval of the proposed deviation from the aforesaid Guidelines along-with affidavit (Form – II) in Petition no 2419/2026 | Notice2419-PDF92202661408PM.pdf | Notice dated 02/09/26 for 2419 of 2026 - Petition under Section 63 read with Section 86(1)(b) of the Electricity Act, 2003 read with Regulation 4 of the UPERC (Modalities of Tariff Determination) Regulations, 2023 and Clause 4 of the Guidelines for long term Procurement of Electricity from Thermal Power Stations set up on Design, Build, Finance, Own and Operate (DBFOO) basis and sourcing fuel as provided under the Model Bidding Documents including allocation of coal under B(I), B(III) and B(IV) of the SHAKTI (Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India) Policy dated 06.03.2019, seeking prior approval of this Hon’ble Commission for procurement of 100 MW thermal power on a long-term basis through Tariff-Based Competitive Bidding process, and seeking approval of the proposed deviation from the aforesaid Guidelines along-with affidavit (Form – II) in Petition no 2419/2026 |
| 14 | Notice dated 02/09/26 for 2184 of 2025 - Western Power Transmission Company Ltd. vs UPPCl and ors - Appropriate direction to the respondents to pay monthly Transmission charges to the petitioner in accordance with the transmission service agreement dated 27.12.20211 and consequential relief. | NoticeofPetitionNo-2184of2025-PDF932026112957AM.pdf | Notice dated 02/09/26 for 2184 of 2025 - Western Power Transmission Company Ltd. vs UPPCl and ors - Appropriate direction to the respondents to pay monthly Transmission charges to the petitioner in accordance with the transmission service agreement dated 27.12.20211 and consequential relief. |
| 15 | Notice dated 24/08/26 for Petition Number 1791 of 2021 - Bharat Jhunjhunwala vs vs Alaknanda Hydro Power Compnay Ltd and UPPCL - Review Application in Petition No. 1267 of 2017 Alaknanda Hydro Power Co. Ltd. Vs. UPPCL order dated 24.08.2020. | NoticePt-no-1791of2021BharatJhunjhunwala-13-10-2026_removed-pdf8252026113332AM.pdf | Notice dated 24/08/26 for Petition Number 1791 of 2021 - Bharat Jhunjhunwala vs vs Alaknanda Hydro Power Compnay Ltd and UPPCL - Review Application in Petition No. 1267 of 2017 Alaknanda Hydro Power Co. Ltd. Vs. UPPCL order dated 24.08.2020. |
| 16 | Notice dated 21/08/26 for - 2411of 2026 Garda Solar Pvt. Ltd. - Seeking clarification, removal of certain difficulty and appropriate directions regarding phased commissioning, declaration of part-cod, consumer-wise commissioning and implementation of regulation 10 in respect of solar parks developed through common evacuation infrastructure. | RescheduledNoticePt-no-2411of2026GardaSolar-17-09-2026-PDF821202612541PM.pdf | Notice dated 21/08/26 for - 2411of 2026 Garda Solar Pvt. Ltd. - Seeking clarification, removal of certain difficulty and appropriate directions regarding phased commissioning, declaration of part-cod, consumer-wise commissioning and implementation of regulation 10 in respect of solar parks developed through common evacuation infrastructure. |
| 17 | Notice dated 20/08/26 for - 2414 of 2026 - PVVNL - Seeking issuance of directions and exercise of the powers to remove difficulty for continuation of the approvals and relaxations granted by this Hon’ble Commission in Petition No. 2345 of 2026 for the establishment of a pilot interstate peer-to-peer trading of renewable energy under the India Energy Stack framework. | NoticePVVNL,Pet-No-2414of2026-PDF820202654523PM.pdf | Notice dated 20/08/26 for - 2414 of 2026 - PVVNL - Seeking issuance of directions and exercise of the powers to remove difficulty for continuation of the approvals and relaxations granted by this Hon’ble Commission in Petition No. 2345 of 2026 for the establishment of a pilot interstate peer-to-peer trading of renewable energy under the India Energy Stack framework. |
| 18 | Notice dated 17/08/26 for 2127 of 2024 - Ghatampur Transmission Limited vs Neyveli Uttar Pradesh Power Ltd - Seeking payment of late payment surcharge. | NoticeofPetitionNo-2127of2024-PDF817202645723PM.pdf | Notice dated 17/08/26 for 2127 of 2024 - Ghatampur Transmission Limited vs Neyveli Uttar Pradesh Power Ltd - Seeking payment of late payment surcharge. |
| 19 | Notice dated 17/08/26 for 2135 of 2024 - Obra-C Badaun Transmission Limited vs UPPCL and ors - Seeking Payment of Late Payment Surcharge. | NoticeofPetitionNo-2135of2024-PDF817202645810PM.pdf | Notice dated 17/08/26 for 2135 of 2024 - Obra-C Badaun Transmission Limited vs UPPCL and ors - Seeking Payment of Late Payment Surcharge. |
| 20 | Notice dated 14/08/26 for - 2410 of 2026 - Indian Railway - Seeking, inter alia, directions to the Uttar Pradesh State Load Despatch Centre to continue issuing a single Standing Clearance/No Objection Certificate for collective scheduling of all the Railway Traction Sub-Stations of the Petitioner within the State of Uttar Pradesh in compliance with the Order dated 05.11.2015 passed by the Central Electricity Regulatory Commission in Petition No. 197/MP/2015 and other reliefs. | NoticeofPetitionNo-2410of2026-PDF814202643057PM.pdf | Notice dated 14/08/26 for - 2410 of 2026 - Indian Railway - Seeking, inter alia, directions to the Uttar Pradesh State Load Despatch Centre to continue issuing a single Standing Clearance/No Objection Certificate for collective scheduling of all the Railway Traction Sub-Stations of the Petitioner within the State of Uttar Pradesh in compliance with the Order dated 05.11.2015 passed by the Central Electricity Regulatory Commission in Petition No. 197/MP/2015 and other reliefs. |
| 21 | Notice dated 14/08/26 for -2413 of 2026 - UPSLDC- Seeking approval of the Commission for grant funding and disbursal of funds from the State PSDF account for implementation of the OASIS project at UP SLDC. | NoticeofPetitionNo-2413of2026-PDF814202643224PM.pdf | Notice dated 14/08/26 for -2413 of 2026 - UPSLDC- Seeking approval of the Commission for grant funding and disbursal of funds from the State PSDF account for implementation of the OASIS project at UP SLDC. |
| 22 | Notice dated 12/08/26 for- 73 SM of 2026 - suomoto proceeding on Charging the Smart Prepaid meters cost for new electricity connections by Discoms in violation of the Orders of the Commission | NoticePet-No-73SMof2026-PDF812202662255PM.pdf | Notice dated 12/08/26 for- 73 SM of 2026 - suomoto proceeding on Charging the Smart Prepaid meters cost for new electricity connections by Discoms in violation of the Orders of the Commission |
| 23 | Notice dated 12/08/26 for - 2234 of 2025 - UPRVUNL – Anpara ‘B’ - Submission of MYT petition for Approve of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect of Anpara “B’ (2 X 500 MW) TPS. | NoticePt-no-2234of2025-UPRVUNL-15-10-2026-PDF812202643333PM.pdf | Notice dated 12/08/26 for - 2234 of 2025 - UPRVUNL – Anpara ‘B’ - Submission of MYT petition for Approve of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect of Anpara “B’ (2 X 500 MW) TPS. |
| 24 | Notice dated 12/08/26 for - 2235 of 2025 - UPRVUNL – Parichha Ext.- Submission of MYT petition for Approva of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect of Parichha Ext. (2 X210 MW) TPS. | NoticePt-no-2235of2025-UPRVUNL-15-10-2026-PDF812202645752PM.pdf | Notice dated 12/08/26 for - 2235 of 2025 - UPRVUNL – Parichha Ext.- Submission of MYT petition for Approva of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect of Parichha Ext. (2 X210 MW) TPS. |
| 25 | Notice dated 12/08/26 for - 2236 of 2025 - UPRVUNL – Harduaganj Ext. - Submission of MYT petition for Approva of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Harduaganj Ext. (2 X250 MW) TPS. | NoticePt-no-2236of2025-UPRVUNL-08-10-2026-PDF812202643614PM.pdf | Notice dated 12/08/26 for - 2236 of 2025 - UPRVUNL – Harduaganj Ext. - Submission of MYT petition for Approva of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Harduaganj Ext. (2 X250 MW) TPS. |
| 26 | Notice dated 12/08/26 for - 2239 of 2025 - UPRVUNL – Parichha Ext. Stage II. - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Parichha Ext. Stage II (2 X250 MW) TPS. | NoticePt-no-2239of2025-UPRVUNL-15-10-2026-PDF812202643744PM.pdf | Notice dated 12/08/26 for - 2239 of 2025 - UPRVUNL – Parichha Ext. Stage II. - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Parichha Ext. Stage II (2 X250 MW) TPS. |
| 27 | Notice dated 12/08/26 for - 2240 of 2025 - UPRVUNL – OBRA ‘B’ - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Obra ‘B’ (5 X200 MW) TPS. | NoticePt-no-2240of2025-UPRVUNL-15-10-2026-PDF812202643912PM.pdf | Notice dated 12/08/26 for - 2240 of 2025 - UPRVUNL – OBRA ‘B’ - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Obra ‘B’ (5 X200 MW) TPS. |
| 28 | Notice dated 12/08/26 for - 2241 of 2025 - UPRVUNL – Harduaganj ‘C’ - Submission of MYT petition for Approva of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in Harduaganj ‘C’ (1 X110 MW) TPS. | NoticePt-no-2241of2025-UPRVUNL-08-10-2026-PDF812202644113PM.pdf | Notice dated 12/08/26 for - 2241 of 2025 - UPRVUNL – Harduaganj ‘C’ - Submission of MYT petition for Approva of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in Harduaganj ‘C’ (1 X110 MW) TPS. |
| 29 | Notice dated 12/08/26 for - 2242 of 2025 - UPRVUNL – Harduaganj II - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in Harduaganj Extn. Stage II (1 X660 MW) TPS. | NoticePt-no-2242of2025-UPRVUNL-08-10-2026-PDF812202645523PM.pdf | Notice dated 12/08/26 for - 2242 of 2025 - UPRVUNL – Harduaganj II - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in Harduaganj Extn. Stage II (1 X660 MW) TPS. |
| 30 | Notice dated 12/08/26 for - 2412 of 2026 - UPNEDA, UPPCL - Approval of PPA executed between Project Developers and UPPCL and UPNEDA for adoption of tariff discovered through RFS invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5 MW for sale of power to UPPCL vide the PPA through RESCO mode under feeder level solarization of PM KUSUM Component C-2 Scheme. | NoticePt-no-2412of2026UPNEDA,UPPCL-29-09-2026-PDF812202614935PM.pdf | Notice dated 12/08/26 for - 2412 of 2026 - UPNEDA, UPPCL - Approval of PPA executed between Project Developers and UPPCL and UPNEDA for adoption of tariff discovered through RFS invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5 MW for sale of power to UPPCL vide the PPA through RESCO mode under feeder level solarization of PM KUSUM Component C-2 Scheme. |
| 31 | Public Notice dt 10/08/26 Draft UPERC (Uttar Pradesh Electricity Grid Code) Regulations 2026 | Public-pdf810202653528PM.pdf | Public Notice dt 10/08/26 Draft UPERC (Uttar Pradesh Electricity Grid Code) Regulations 2026 |
| 32 | Notice dated 06/08/26 for - 2406 of 2026 - UPPCL - Approval of Supplementary Tripartite Power supply & Banking Agreement dated 20.04.2026 for extension of the term of Tripartite Power Supply & Banking Agreement dated 26.10.2021, for 100% Banking of 60,000 KW Power from captive Power Plant known as Renusagar Power division of Hindalco situated at Renusagar District Sonebhadra U.P. | NoticePt-no-2406of2026UPPCL-17-09-2026-PDF86202653544PM.pdf | Notice dated 06/08/26 for - 2406 of 2026 - UPPCL - Approval of Supplementary Tripartite Power supply & Banking Agreement dated 20.04.2026 for extension of the term of Tripartite Power Supply & Banking Agreement dated 26.10.2021, for 100% Banking of 60,000 KW Power from captive Power Plant known as Renusagar Power division of Hindalco situated at Renusagar District Sonebhadra U.P. |
| 33 | Notice dated 06/08/26 for - 2408 of 2026 - UPPCL - Seeking approval of the Supplementary Tripartite Power Supply & Banking Agreement dated 30.03.2026 executed between Uttar Pradesh Power Corporation Limited, M/s Grasim Industries Limited and Purvanchal Vidyut Vitran Nigam Limited in continuation of the Principal Tripartite Power Supply & Banking Agreement dated 03.02.2021 governing banking of electricity generated from the captive generating station of M/s Grasim Industries Limited in accordance with the provisions of the UPERC (Captive and Renewable Energy) Regulations, 2024. | NoticePt-no-2408of2026-UPPCL-17-09-2026-PDF86202653728PM.pdf | Notice dated 06/08/26 for - 2408 of 2026 - UPPCL - Seeking approval of the Supplementary Tripartite Power Supply & Banking Agreement dated 30.03.2026 executed between Uttar Pradesh Power Corporation Limited, M/s Grasim Industries Limited and Purvanchal Vidyut Vitran Nigam Limited in continuation of the Principal Tripartite Power Supply & Banking Agreement dated 03.02.2021 governing banking of electricity generated from the captive generating station of M/s Grasim Industries Limited in accordance with the provisions of the UPERC (Captive and Renewable Energy) Regulations, 2024. |
| 34 | Notice dated 06/08/26 for - 2411 of 2026 - Garda Solar Pvt. Ltd. - Seeking clarification, removal of certain difficulty and appropriate directions regarding phased commissioning, declaration of part-cod, consumer-wise commissioning and implementation of regulation 10 in respect of solar parks developed through common evacuation infrastructure. | NoticePt-no-2411of2026GardaSolar-22-09-2026-PDF86202653926PM.pdf | Notice dated 06/08/26 for - 2411 of 2026 - Garda Solar Pvt. Ltd. - Seeking clarification, removal of certain difficulty and appropriate directions regarding phased commissioning, declaration of part-cod, consumer-wise commissioning and implementation of regulation 10 in respect of solar parks developed through common evacuation infrastructure. |
| 35 | Notice dated 05/08/26 for- 2409 of 2026 - UPPCL - Seeking clarification regarding the applicability and continuation of tariff adjustment/deduction on account of utilization of existing transmission infrastructure for evacuation of power from additional generating capacity commissioned under supplementary power purchase agreements in light of the Uttar Pradesh electricity regulatory commission (captive and renewable energy generating plants) regulations, 2024. | NoticePt-no-2409of2026DCMSriramLtd--03-09-2026-PDF85202643504PM.pdf | Notice dated 05/08/26 for- 2409 of 2026 - UPPCL - Seeking clarification regarding the applicability and continuation of tariff adjustment/deduction on account of utilization of existing transmission infrastructure for evacuation of power from additional generating capacity commissioned under supplementary power purchase agreements in light of the Uttar Pradesh electricity regulatory commission (captive and renewable energy generating plants) regulations, 2024. |
| 36 | Notice dated 04/08/26 for - 2407 of 2026 - UPPCL and Ors. - Petition under section 86(1)(k) of the electricity act, 2003 read with regulation 17 of the UPERC (open access) regulations, 2019 read with regulation 57 of the UPERC (conduct of business) regulations 2019, and in furtherance of the directions issued by the hon’ble supreme court in the case of Indian Railways versus West Bengal state electricity distribution company limited and others (2026 SCC online SC 826). | NoticeforAdmissionofPetitionNo-2407of2026(UPPCL&Ors-)-PDF84202614847PM.pdf | Notice dated 04/08/26 for - 2407 of 2026 - UPPCL and Ors. - Petition under section 86(1)(k) of the electricity act, 2003 read with regulation 17 of the UPERC (open access) regulations, 2019 read with regulation 57 of the UPERC (conduct of business) regulations 2019, and in furtherance of the directions issued by the hon’ble supreme court in the case of Indian Railways versus West Bengal state electricity distribution company limited and others (2026 SCC online SC 826). |
| 37 | Notice dated 31/07/26 for 2031 of 2023 - Ghatampur Transmission Limited vs UPPCL and ors- Seeking payment of Transmission Charges applicable to 400k V DC Ghatampur TPS Kanpur (PG)DC (Element No. 1) with effect from 05.02.2022 onwards. | Notice2031-pdf731202655034PM.pdf | Notice dated 31/07/26 for 2031 of 2023 - Ghatampur Transmission Limited vs UPPCL and ors- Seeking payment of Transmission Charges applicable to 400k V DC Ghatampur TPS Kanpur (PG)DC (Element No. 1) with effect from 05.02.2022 onwards. |
| 38 | Notice dated 31/07/26 for 2067 of 2024 - Shree Cement - Direct the respondent to pay the balance amount of Rs. 23,45,594 to the petitioner with along with the late payment surcharge in term of the contract from the date of order till the date of payment. | Notice2067-1-pdf731202655214PM.pdf | Notice dated 31/07/26 for 2067 of 2024 - Shree Cement - Direct the respondent to pay the balance amount of Rs. 23,45,594 to the petitioner with along with the late payment surcharge in term of the contract from the date of order till the date of payment. |
| 39 | Notice dated 31/07/26 for 2127 of 2024 - Ghatampur Transmission Limited vs Neyveli Uttar Pradesh Power Ltd - Seeking payment of late payment surcharge. | Notice2127-pdf731202655343PM.pdf | Notice dated 31/07/26 for 2127 of 2024 - Ghatampur Transmission Limited vs Neyveli Uttar Pradesh Power Ltd - Seeking payment of late payment surcharge. |
| 40 | Notice dated 31/07/26 for 2135 of 2024 - Obra-C Badaun Transmission Limited vs UPPCL and ors - Seeking Payment of Late Payment Surcharge . | Notice2135-pdf731202655610PM.pdf | Notice dated 31/07/26 for 2135 of 2024 - Obra-C Badaun Transmission Limited vs UPPCL and ors - Seeking Payment of Late Payment Surcharge . |
| 41 | Notice dated 31/07/26 for 2184 of 2025 - Western Power Transmission Company Ltd. vs UPPCl and ors - Appropriate direction to the respondents to pay monthly Transmission charges to the petitioner in accordance with the transmission service agreement dated 27.12.20211 and consequential relief . | Notice2184-pdf731202655953PM.pdf | Notice dated 31/07/26 for 2184 of 2025 - Western Power Transmission Company Ltd. vs UPPCl and ors - Appropriate direction to the respondents to pay monthly Transmission charges to the petitioner in accordance with the transmission service agreement dated 27.12.20211 and consequential relief . |
| 42 | Notice dated 31/07/26 for 2190 of 2025 - South East U.P. Power Transmission Company Limited vs UPTTCL and ors - Seeking Declaration/Clarification from This Hon’ble Commission Regarding the Transmission Charges Applicable on the Group-1 and Group-2 elements of the Project. | Notice2190-pdf731202660233PM.pdf | Notice dated 31/07/26 for 2190 of 2025 - South East U.P. Power Transmission Company Limited vs UPTTCL and ors - Seeking Declaration/Clarification from This Hon’ble Commission Regarding the Transmission Charges Applicable on the Group-1 and Group-2 elements of the Project. |
| 43 | Notice dated 31/07/26 for 2267 of 2025 Powergrid Meerut Simbhaoli Transmission Ltd.- Change in Law. | Notice2267-pdf731202660321PM.pdf | Notice dated 31/07/26 for 2267 of 2025 Powergrid Meerut Simbhaoli Transmission Ltd.- Change in Law. |
| 44 | Notice dated 31/07/26 for 2285 of 2025 -UPPTCL - Seeing recovery of additional payment surcharge paid to Obra C Badaun Transmission limited in pursuance of the order passed by the Honble Commission on 24.06.2024 in Petition No. 1920/2022and order dated 28.02.2025passed by APTEL in appeal no. 369 of 2024. | Notice2285-pdf731202660410PM.pdf | Notice dated 31/07/26 for 2285 of 2025 -UPPTCL - Seeing recovery of additional payment surcharge paid to Obra C Badaun Transmission limited in pursuance of the order passed by the Honble Commission on 24.06.2024 in Petition No. 1920/2022and order dated 28.02.2025passed by APTEL in appeal no. 369 of 2024. |
| 45 | Notice dated 31/07/26 for 2286 of 2025 -UPRVUNL - Seeing recovery of additional payment surcharge paid to Obra C Badaun Transmission limited in pursuance of the order passed by the Honble Commission on 24.06.2024 in Petition No. 1920/2022and order dated 28.02.2025passed by APTEL in appeal no. 357 of 2025 and 369 of 2024. | Notice2286-pdf731202660502PM.pdf | Notice dated 31/07/26 for 2286 of 2025 -UPRVUNL - Seeing recovery of additional payment surcharge paid to Obra C Badaun Transmission limited in pursuance of the order passed by the Honble Commission on 24.06.2024 in Petition No. 1920/2022and order dated 28.02.2025passed by APTEL in appeal no. 357 of 2025 and 369 of 2024. |
| 46 | Notice dated 31/07/26 for 2288 of 2025 - TP Jalpura Khurja Power Ltd. - Seeking Extension of Scheduled Commercial Operation Date and other Consequential reliefs. | Notice2288-pdf731202660540PM.pdf | Notice dated 31/07/26 for 2288 of 2025 - TP Jalpura Khurja Power Ltd. - Seeking Extension of Scheduled Commercial Operation Date and other Consequential reliefs. |
| 47 | Notice dated 31/07/26 for 2293 of 2025 - SEUPPTCL - Seeking appropriate directions regarding the interpretation and application of the methodology for Escapable Transmission Charges as stipulated under schedule 5 and 7 of the TSA dated 20.01.2012, executed between the petitioner and long-term Transmission customer. | Notice2293-pdf731202660620PM.pdf | Notice dated 31/07/26 for 2293 of 2025 - SEUPPTCL - Seeking appropriate directions regarding the interpretation and application of the methodology for Escapable Transmission Charges as stipulated under schedule 5 and 7 of the TSA dated 20.01.2012, executed between the petitioner and long-term Transmission customer. |
| 48 | Notice dated 31/07/26 for 2008 of 2023 - Amplus RJ Solar Private Limited vs UPPCL and ors - Direction to Respondents to allow banking up to 100% of the energy generated and to account for and retrospectively settle the energy already injected and lost by the petitioner qua the captive users. | NoticeAmplusRJSolar,Pet-No-2008of23-PDF731202653754PM.pdf | Notice dated 31/07/26 for 2008 of 2023 - Amplus RJ Solar Private Limited vs UPPCL and ors - Direction to Respondents to allow banking up to 100% of the energy generated and to account for and retrospectively settle the energy already injected and lost by the petitioner qua the captive users. |
| 49 | Notice dated 31/07/26 for 2013 of 2023 - Amplus Solar Shakti Private Ltd vs UPPCL and ors - Appropriate Direction to Respondents to allow banking up to 100% of the energy generated. | NoticeAmplusSolar,Pet-No-2013of23-PDF731202653843PM.pdf | Notice dated 31/07/26 for 2013 of 2023 - Amplus Solar Shakti Private Ltd vs UPPCL and ors - Appropriate Direction to Respondents to allow banking up to 100% of the energy generated. |
| 50 | Notice dated 29/07/26 for - 2402 of 2026 - Spaark Bresson WTE Pvt. Ltd.- Approval of provisional tariff from the second financial year onwards for the supply of 21 MW power from the 24.70 MW Municipal Solid Waste Based Waste-To-Energy Plant at Kuberpur, Agra, Uttar Pradesh. | RescheduledNoticePt-no-2402of2026SpaarkBresson-20-08-2026-PDF729202613358PM.pdf | Notice dated 29/07/26 for - 2402 of 2026 - Spaark Bresson WTE Pvt. Ltd.- Approval of provisional tariff from the second financial year onwards for the supply of 21 MW power from the 24.70 MW Municipal Solid Waste Based Waste-To-Energy Plant at Kuberpur, Agra, Uttar Pradesh. |
|